Up

projekte-en

Winding systems and construction equipment for ultra-deep shaft sinkings: examples based on the ongoing WS-10 and SKS-1 projekts in Norilsk
SKS-1 Norilsk shaft tubbing successfully sealed with emulsion grouting NOH2O
The freeze is over - now things are warming up
THYSSEN SCHACHTBAU's Swiss branch looks back at 12 years of success
Replacement of shaft pipes and cables at the K+S KALI owned Neuhof-Ellers potash mine
Konrad final waste repository - modernisation of the shaft winding system and extension of adjacent shaft inset zones
RAG shaft drainage: installing DN 1000 GRP pipes for a mine water pumping system
Installing a new mine winder at Fürstenhall shaft for the K+S owned Siegfried-Giesen reserve mine
Drilling ventilation borehole G 248 at RAG's Prosper-Haniel colliery
Norway adventure: drilling an inclined shaft for a hydro power plant
The Konrad transformation - from iron-ore mine to a final waste repository
Tough going for man and machine
In-situ roadway stopping in rock salt measures
Design and approval planning for the upgrade of number 2 shaft at Asse II mine and for the sinking of a new Asse number 5 shaft
Second skip winding shaft will increase potash output at EuroChem Volgakali's Gremyachinski mine
Freeze-hole drilling and ground freezing for the sinking and lining of number 1 and number 2 shafts at the 'Usolski Combine' Potash Mine in the Russian Federation
THYSSEN SCHACHTBAU starts project build for the SKS-1 production shaft complex for OJSC MMC Norilsk Nickel
 
 
Powered by Phoca Download