Accessibility Tools

Skip to main content

Horizontal Full-Face Drilling Morsleben

  • Gewerk: Bohrtechnik
  • Projektnummer (auch Name des Galerieordners): 00
  • Projektstatus: Inaktiv
  • Land: Germany
  • Stadt: Ingersleben
  • Auftraggeber: Bundesgesellschaft für Endlagerung mbH (BGE)
  • Latitude: 52.1843
  • Longitude: 11.1027
  • Dauer: 2018
  • Projektbericht (PDF): 2018_Referenz_ERAM_Morsleben_Vollbohrung.pdf

The project involved the execution of a 130 m long horizontal full-face drilling on the 3rd level of the decommissioned Morsleben repository. The objective was to verify the absence of gas in the surrounding rock as a measure to stabilize the repository, which is considered at risk of collapse. Explosion-proof drilling equipment (Diamec 262) was used, classified for methane atmospheres in accordance with explosion group II A and temperature class T1.

  • Hits: 7

THYSSEN SCHACHTBAU GMBH
A company within the THYSSEN SCHACHTBAU Group

  • This email address is being protected from spambots. You need JavaScript enabled to view it.